Difference between revisions of "Connection Info"
From Adjutant Wiki
Line 20: | Line 20: | ||
:'''Tap Installation''' Tap installation is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, Problem Code (Standard Task) 12.02 is linked to the TAPCOMP rule on the Rule Maintenance screen. | :'''Tap Installation''' Tap installation is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, Problem Code (Standard Task) 12.02 is linked to the TAPCOMP rule on the Rule Maintenance screen. | ||
− | [[File:Connection_Info_Rule_Maintenance_12.02_Tap_Complete.png]] | + | [[File:Connection_Info_Rule_Maintenance_12.02_Tap_Complete.png|800px]] |
− | [[File:Connection_Info_Standard_Task_12.02_Tap_Complete.png]] | + | [[File:Connection_Info_Standard_Task_12.02_Tap_Complete.png|800px]] |
:'''Commercial Sewer Inspection''' Sewer Inspections are linked by a rule named Sewer Complete Codes (SEWERCOMP). In the example below, Problem Code (Standard Task) 8.09 is linked to the SEWERCOMP rule on the Rule Maintenance screen. | :'''Commercial Sewer Inspection''' Sewer Inspections are linked by a rule named Sewer Complete Codes (SEWERCOMP). In the example below, Problem Code (Standard Task) 8.09 is linked to the SEWERCOMP rule on the Rule Maintenance screen. |
Revision as of 12:09, 5 December 2022
General Description
How to Access
- The Connection Info screen is an attribute, it can be accessed only through the Attributes Menu on an organization’s Master Screen.
Function The Connection Info screen displays a summary of location and inspection information for an individual Water District customer.
The system uses a rule to link and mark specific problem codes as a specific inspection type.
Linked Tasks
The Install Date, Swr Date Pass, and CCSI Date Pass fields will auto populate with a completed/passed date when the inspection has been passed and the Task has been completed in the system.
- Tap Installation Tap installation is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, Problem Code (Standard Task) 12.02 is linked to the TAPCOMP rule on the Rule Maintenance screen.
- Commercial Sewer Inspection Sewer Inspections are linked by a rule named Sewer Complete Codes (SEWERCOMP). In the example below, Problem Code (Standard Task) 8.09 is linked to the SEWERCOMP rule on the Rule Maintenance screen.
- Customer Service Inspection Customer Service Inspections are linked by a rule named CSI Complete Codes (CSICOMP). In the example below, Problem Code (Standard Task) 9.50 is linked to the CSICOMP rule on the Rule Maintenance screen.