Connection Info - Inspection Pass/Fail

Modified on Fri, 06 May 2016 10:47 by hmontgomery — Categorized as: Tapping and Inspection, Water and Wastewater Services, Work Order Management


General Description

Default Menu Location Organization >> Connection Attribute >> Connection Info

Screen Name CONNINFO

Function The three inspection pass date fields will auto populate with a completed/passed date when the work order for each of these inspections has been passed and completed in the system.

Image


The system uses a rule to link and mark specific problem codes as a specific inspection type.

Tap Installation

The Install is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, problem code (standard task) that is linked is problem code 1.10.

Click to open full image

Click to open full image

Click to open full image

Click to open full image


Sewer Inspection

The Sewer Inspection is linked by a rule named Sewer Complete Codes (SEWERCOMP).In the example below, problem code (standard task) that is linked is problem code 13.1.

Click to open full image

Click to open full image

Click to open full image

Click to open full image


CSI Inspection

The CSI Inspection is linked by a rule named CSI Complete Codes (CSICOMP).In the example below, problem code (standard task) that is linked is problem code 9.21.

Click to open full image

Click to open full image

Click to open full image

Click to open full image