Page History: Connection Info - Inspection Pass/Fail
Compare Page Revisions
Page Revision: Fri, 06 May 2016 10:20
The three inspection pass date fields will auto populate when the work order for each of these inspections has been completed.
The system uses a rule to link and mark specific problem codes as a specific inspection type.
Tap Installation
The Install is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, problem code (standard task) that is linked is problem code 1.10.
Tap Complete Rule |
Tap Problem Code |
Sewer Inspection
The Sewer Inspection is linked by a rule named CSI Complete Codes (CSICOMP).In the example below, problem code (standard task) that is linked is problem code 13.1.
Sewer Complete Rule |
Sewer Problem Code |
CSI Inspection
The CSI Inspection is linked by a rule named CSI Complete Codes (CSICOMP).In the example below, problem code (standard task) that is linked is problem code 9.21.
CSI Complete Rule |
CSI Problem Code |