Page History: PWO Inputs Needed Report
Compare Page Revisions
Page Revision: Fri, 09 Jun 2017 09:26
General Information
Default Menu Location: Reports >> Production >> PWO Inputs Needed
Screen Name: PWONEED
Function:The PWO Inputs Needed Report is intended to show exactly what raw materials will be needed will be needed to complete the work order, based on the BOM defaults.
The Report can also be launched from the Report Drop Down from the Production Work Order itself. The list of reports is controlled by the
http://www.abiscorp.com/AdjWiki/RULE-PWOREPORT.ashx?NoRedirect=1#Rule_Setup_–_Text_Fields_1PWOREPORT rule.