Page History: Job Cost by SO Type Report
Compare Page Revisions
Page Revision: Mon, 19 Nov 2018 14:00
General Information
Default Menu Locator Reports >> Project Control >> Job Cost by SO Type
Screen Name JOBCOST2
Function Determine the cost versus the revenue on a specific project.
Report Filter
Project #: Enter the project number that you want the report to generate
Project Name: Find a project by the name.
Sales Order Type: Check any sales order type to include it on the report.
Include Manual JE: Check this to include manual journal entries coded to the project.
FAQ
Q: Why doesn't the cost match up to what displays on the Job Cost tab of the project.
A: This could be due either of the following:
1. The Job Cost by SO Type uses the base cost of the part. The Job Cost tab of the Project displays the average cost of the item.
2. The Job Cost by SO Type groups cost based on the department (indicate by an attribute in the Item Master record). The Job Cost tab of the Project groups items by the Price Group indicated on the Item Master record.