Page History: HOW TO - Release and Ship Freight Using a Material Receipt
Compare Page Revisions
Page Revision: Tue, 28 Oct 2008 08:22
STEP 1: TRANSACTION >> LOGISTICS >> IN-OUT PROCESSSTEP 2: Enter the
Material Receipt Number from the
MR Label on the paper Material Receipt into the
MRID blank (or scan the barcode on the MR Label with a light pen). Press
Enter.
STEP 3: Type or scan the code for the organization to which the package was sold into the
Sold To: blank. Press
Enter. The name of the Sold To organization appears in the blank to the right and the cursor advances to the next row.
STEP 4: Type or scan the code for the organization to which the package was billed into the
Bill To: blank. Press
Enter. The name of the Bill To organization appears in the blank to the right and the cursor advances to the next row.
STEP 5: Type or scan the code for the organization to which the package will be shipped into the
Ship To: blank. Press
Enter. The name of the Ship To organization appears in the blank to the right.
STEP 6: Click on the
Save button.
STEP 7: TRANSACTION >> LOGISTICS >> MR PICKINGSTEP 8: Enter the
Material Receipt Number from the
MR Label on the paper Material Receipt into the
MRID blank (or scan the barcode on the MR Label with a light pen). Press
Enter.
STEP 9: The Adjutant Organization ID of the customer appears in the
CustNo blank, with the full name of the customer below it.
STEP 10: Click on
GEN. The "Update Shipping Event" window appears, with a generated
Shipping Event Number ("SE Number").
STEP 11: Enter the internal
Event Name, if any. (In many companies, this is an internal tracking number from the company’s database of shipments.)
STEP 12: Enter the
Destination Code, if any, designating the physical location for shipment.
STEP 13: Enter the
Shipping Method (the freight carrier name or the method of shipment).
STEP 14: Click
Save. Adjutant returns to the Material Receipt Release window.
STEP 15: Choose the shipping event you just generated from the
Shipping Event drop-down menu.
STEP 16: Choose the appropriate
RF Terminal for shipping from the drop-down menu. (In some warehouses, the drop-down menu contains only one choice, a
queue. Choose the queue, and the shipment will be handled by the next available RF Terminal.)
STEP 17: Check
Submit for Grouping/Packing.
STEP 18: Click
Release.
STEP 19: Check
Release to Shipping. Click
Release.
STEP 20: Adjutant prints a
Packing Form with two sheets – one for office personnel and one for warehouse personnel.
STEP 21: Pack existing freight in the warehouse into new cartons for shipment.
STEP 22: Type
$$ and press
Enter to return to the scanner’s
Main Menu.
STEP 23: Type
8 and press
Enter.
STEP 24: The label printer prints out two copies of a new
C Label for each carton to be shipped.
STEP 25: Affix one copy of each
C Label to each carton to be shipped. Affix the other copy to the
Packing Form.
STEP 26: Scan the barcode for the
SE Number on the Packing Form, then scan all the attached
C Labels that will go into that carton.
STEP 27: Type
$$ and press
Enter to return to the scanner’s
Main Menu.
STEP 28: Type
11 and press
Enter.
STEP 29: Scan each carton's
C Label, then enter the correct
dimensions and
gross weight of the carton into the scanner.
Repeat this process for each carton to be shipped.
STEP 30: If necessary, return the
Packing Form with affixed labels to office personnel to match with the other copy of the
Packing Form and use in the following steps.
STEP 31: In some implementations of Adjutant, it is necessary to clear the packing hold on the shipment. In Adjutant, choose
MAINTAIN >> PROJECTS, click on the
Shipping Events tab, and clear the
PackHold checkbox.
STEP 32: TRANSACTION >> LOGISTICS >> SE PICKINGSTEP 33: Enter or scan the
Shipping Event Number from the Packing Form into the
Shipping Event blank.
STEP 34: Choose the correct scanning terminal in the warehouse (or the queue) from the
RF Terminal drop-down list.
STEP 35: Check
Release for Shipping.
STEP 36: Click on
Release to Warehouse.
STEP 37: In Adjutant, choose
MAINTAIN >> PROJECTSSTEP 38: Enter the
Shipping Event Number (without the "-A") into the
Project # blank and press
Enter.
STEP 39: Press the
Print button.
STEP 40: Adjutant prints a
Project Load Sheet with a
Shipping Event barcode, a
Load Number barcode and
Carton ID Numbers,
locations,
weights and
dimensions for each carton to be shipped.
STEP 41: When the shipping trucks arrive, log on to the wireless hand-held scanner. The
Main Menu appears.
STEP 42: Type
39 and press
Enter.
STEP 43: Scan the
Shipping Event barcode on the
Project Load Sheet, then scan the
Load Number barcode.
STEP 44: Scan the barcode for the shipment’s
current location, then scan the barcode for the shipment’s
destination (a code that represents the destination office or warehouse, or in some cases the freight carrier handling the shipment; this is often printed on a reference page in the warehouse).
STEP 45: The scanner displays
"Which C#?" Scan the
C Number of each carton, and the scanner displays the
percentage done. After the last carton is scanned, the scanner displays
"Scanning Complete."STEP 46: Load the shipment onto the truck.
STEP 47: The warehouse and the business office should each file a copy of the
Project Load Sheet for its records.