PWO Inputs Needed Report

Modified on Fri, 09 Jun 2017 11:11 by Curtis Riddle — Categorized as: Production

Table of Contents [Hide/Show]



General Information

Default Menu Location: Reports >> Production >> PWO Inputs Needed

Screen Name: PWONEED

Function:The PWO Inputs Needed Report is intended to show exactly what raw materials will be needed will be needed to complete the work order, based on the BOM defaults.

Image

The Report can also be launched from the Report Drop Down from the Production Work Order itself. The list of reports is controlled by the PWOREPORT rule.

Image