Adjutant
Welcome Guest, you are in: Login

Desktop Adjutant

RSS

Navigation







Quick Search
»


Advanced Search »

Page History: Connection Info - Inspection Pass/Fail

Compare Page Revisions



« Older Revision - Back to Page History - Newer Revision »


Page Revision: Fri, 06 May 2016 10:29


The three inspection pass date fields will auto populate when the work order for each of these inspections has been completed.

The system uses a rule to link and mark specific problem codes as a specific inspection type.

Tap Installation

The Install is linked by a rule named Tap Complete Codes (TAPCOMP). In the example below, problem code (standard task) that is linked is problem code 1.10.

Click to open full image

Click to open full image

Click to open full image

Click to open full image


Sewer Inspection

The Sewer Inspection is linked by a rule named Sewer Complete Codes (SEWERCOMP).In the example below, problem code (standard task) that is linked is problem code 13.1.

Click to open full image

Click to open full image

Click to open full image

Click to open full image


CSI Inspection

The CSI Inspection is linked by a rule named CSI Complete Codes (CSICOMP).In the example below, problem code (standard task) that is linked is problem code 9.21.

Click to open full image

Click to open full image

/csi_comp.png]
Click to open full image

Click to open full image






Adjutant Wiki via Screwturn version 3.0.5.600. You are logged in as Guest. There are 921 pages in the Wiki. Learn More About Adjutant Enterprise Solutions